Generator sizing for workshop tools: running and starting loads

Generator selection starts with the equipment that must run together and the requirements of starting it. Adding the advertised watts of several tools is not a complete load assessment.

Prepare a load schedule before comparing generators. It helps the supplier check continuous demand, temporary starting demand and the required electrical supply without guessing from a list of tool names.

Separate running and starting information

Running power describes the demand during normal operation. Starting demand is the temporary requirement associated with starting equipment, where applicable. A generator's peak figure and continuous rated output are also different values.

Honda's generator sizing guidance distinguishes starting and running loads. Its examples explain the principle; use the actual requirements of your equipment for a purchase decision rather than transferring another appliance's estimate to your tool.

Do not assume a fixed starting multiplier for every motor. Obtain manufacturer information for the relevant load and ask how the proposed generator handles that starting event.

Build a load schedule

Equipment information What to record
Load identification Exact tool or equipment model
Supply Required voltage, frequency and phase
Running demand Confirmed rating and units
Starting requirement Manufacturer data or a requirement to obtain it
Simultaneous operation Which loads must run or start together
Use pattern Intended operating period and site arrangements

Keep units visible. A figure in kVA should not be treated as the same figure in kW without the necessary electrical information. Likewise, a fuel-tank capacity is not a continuous-output rating or a guaranteed runtime for your load.

A load schedule is not an installation design

Consider a workshop that needs lighting, a tool and an air compressor. The important question is whether they must operate together and what happens when a motor starts while the other loads are running. The equipment data, starting method and operating sequence are needed to evaluate that arrangement.

If an approved operating sequence allows certain loads to run separately, record it explicitly. Do not base the generator choice on an operating restriction that nobody on site knows about.

A supplier or qualified electrical professional should confirm the proposed generator, connections and protective arrangements. Generator location and exhaust precautions must follow the manual; a purchase comparison does not authorise indoor operation or a connection to building wiring.

Compare the confirmed output and supply

Use the generator's continuous rating under its stated conditions. Check the voltage, phase, frequency, available outlets and any manufacturer restrictions relevant to the intended tools. If a load needs a particular power quality or starting arrangement, include that requirement in the enquiry.

You can then compare the generator subset of Yuri's generator and compressor range. Air compressors in that collection serve a different supply function and should not be compared with generators by a shared motor-power figure.

Before requesting a quotation

Send the load schedule with model numbers and the requirements still to be confirmed. Ask for the proposed continuous and starting-load arrangement in writing, including any restrictions on simultaneous use. Keep that information with the equipment records so the purchase decision and the intended operating arrangement agree.